Compliance guide

Reading a certification submittal, mark by mark.

A page of logos proves nothing to a reviewer. What clears a submittal is a report, a certificate number and a model designation that matches the units arriving on site.

We hold CE, CB, ETL, SAA, LVD, EMC, DOE, KC and FCC coverage, with production run under an ISO 9001:2015 quality management system. That list is a capability, not a claim that any given unit is certified for any given market: certificates are issued against a model, and the model you enquire about is the model the file is drawn for.

The practical difference between a supplier who can help you clear a submittal and one who cannot is whether they can name the document, the number and the scope. The table is what we send, per market.

What each mark is, and what a reviewer normally asks for
MarkWhere it is asked forWhat the file actually is
ETLUnited States, CanadaListing to the applicable standard by an NRTL, with a control/track number and a listing mark on the product
CE with LVD and EMCEuropean Union, EEADeclaration of conformity naming the directives and the harmonised standards applied, plus the test reports behind it
CBIECEE member countriesCB test report and certificate, used as evidence inside a national approval rather than as the approval itself
SAAAustralia, New ZealandNational registration or certification against the applicable AS/NZS standard
KCSouth KoreaKorean certification or self-regulatory registration, depending on the product category
FCCUnited StatesEquipment authorisation for the electronics — remote, receiver, LED driver — not for the fan as a whole
DOEUnited StatesEnergy-programme requirements applying to the covered product category

A listing mark and a test report are not interchangeable

North American reviewers ask for a listing to a product safety standard from an accredited body. That implies ongoing factory and product follow-up, not a single bench test. A report showing that one sample passed a set of tests is useful evidence and it is not the same thing. If your specification says listed, we send the listing evidence and the file reference, and we say plainly which models do not carry it.

One 72 inch model in the catalogue is supplied ETL listed and it is flagged as such on its own product page. Do not read that across to the rest of the range.

CE is a declaration; the directives are the test

For EU-bound commercial projects the meaningful paperwork is the declaration of conformity that names the directives and the standards applied — for a fan light that is normally the low-voltage and electromagnetic-compatibility side — together with the reports behind it. A bare CE graphic on a catalogue page carries no obligations and convinces no reviewer, so we send the declaration with the standard references visible.

CB is the shortest route to a second market

A CB report is issued once under the IECEE scheme and then used as the technical evidence inside national approvals in member countries. Where a buyer is going into more than one market from the same tooling, the CB route avoids repeating the full test programme for each country — but it does not replace the national approval itself, and the local authority decides how much of the CB file it will accept.

Certification follows the model, not the factory

Change the motor, the blade material, the light kit, the driver or the finish code, and you may have changed the certified configuration. This is where OEM projects get caught: the file on hand describes yesterday model. Before your submittal is frozen, send us the exact designation you intend to specify and we confirm against the file rather than against the brochure photograph.

For the same reason we quote custom configurations as a new designation. It is slower to write down and much cheaper than discovering it at customs.

Checklist

  • Model designation on the certificate matches the designation on the purchase order
  • Certificate number and issuing body stated, not just a logo
  • Declaration of conformity names directives and standards
  • Listing evidence distinguishes listed from tested-to
  • Custom motor, light kit or finish treated as a configuration change
  • Electronic accessories (remote, receiver) covered separately

Enquiry

Send a model, a quantity and a destination.

That is enough for a real quotation. Catalog prices are a starting range, not a final offer.

Your enquiry is sent to our export desk and stored so we can follow up — see the privacy notice. Prefer email? Write to hcm@hcfanlight.com.

Reply within one working day

Enquiries are answered by the export desk in Zhongshan, not an outsourced inbox.

Quoted on FOB terms

USD, export packing included, with the freight option that matches your destination.

Documents before you commit

Test reports, certificate files and packing dimensions are sent with the quotation.